Tag Archives: GRT

april2015transit_changes

2015 GRT preferred service improvement plan

Beginning tomorrow, Grand River Transit will be hosting a series of public consultations on its preferred 2015 service improvement plan.  These new route designs, mostly centred around Kitchener wards 1, 2, 7, 8, 9, and 10, continue the trend of a more direct, grid-like frequent service network we saw for Waterloo in 2013. We encourage you to attend a session or submit your feedback online.

Notable changes include a new Victoria/Highland iXpress route, more continuos cross-corridor (east-west-ish) routes, limited service to Bingeman’s Centre Drive, and gradual shifts away from Highland Hills and Charles Street Terminal towards The Boardwalk and the future transit hub for certain routes. Many of these changes are in preparation for ION light rail. Certain route changes have also spurred investigation of a new highway crossing for people on foot and bike.

Some of the preferred improvements, especially around the central transit corridor, are scaled back from what had originally been proposed in the fall, in part due to the challenges and resource constraints during ION construction.

We’ve tried to summarize these changes in the post below. While not part of the plan under consultation, we’ve also included changes to Cambridge service and the announcement of funding for transit in Wilmot in our discussion.

(more…)

Read More »

What are your priorities for Waterloo Region?

The Region is collecting public input for its 2015-18 Strategic Plan and conducting a service review. The choices made over the next few years regarding transit, active transportation, and land use planning will be important to the success of ION light rail and the livability of your community. This is your opportunity to weigh in and help shape the Region’s direction and investments.

The Region has set up a website called Strat Chat to collect input. On it, you can comment on or rate ideas, or suggest your own for topics such as transportation, your vision for the Regionservices that you feel merit greater investment, and many more.

One idea shared on the site that we’d hope you’d consider supporting is greater investment in frequent transit. This would make transit a more reliable transportation choice and increase ridership ahead of ION service. On snowy days like today, you may also want to consider whether having municipally cleared sidewalks is a good idea.

Read More »

grtmap2-2

Thoughts on the GRT 2015 Improvement Plan

We’ve written briefly about Grand River Transit’s proposed 2015 Service Changes, and we’d like to share a few observations we’ve had, both about how these changes will improve the transit system in Waterloo Region, and the challenges ahead as we move towards a fast, frequent, grid network.

We encourage everyone to provide your feedback to GRT, at both at their final public consultation on Wednesday November 26th, and via their online response form.

Route 7

With a consolidated route 7 appearing in both options for the 2015 service, it seems that GRT is strongly committed to the kind of service improvement that we have talked about on numerous occasions. Splitting the East/West service off of route 7 by removing the 7D/E branches and replacing them with increased University and Columbia service is an important change that will improve the transit experience along the full length of King St without increasing costs.

New Route 7

The new consolidated route 7 will allow for frequent, direct, service every 7.5 minutes to employment and retail on King St north of Columbia, and Weber St east of the expressway. Coverage goals around Fairview Mall would be served by the 1, 8 and 23. This keeps the most frequent service on the busier corridors without having to run through quiet residential streets, but keeps local service for the neighbourhood.

With the separation of the north-south from east-west services at King & University, this will mean transfers. Currently the 7 does not connect with the 202, and it is a long walk to the existing iXpress stop. As the major east-west route, the 202 will need a stop at King & University to support these transfers.

University/Columbia Capacity

Removing the 7D/E branches will take away existing capacity on University and Columbia Avenues. GRT will need to evaluate service on these streets, to make sure there is enough capacity to handle the extra ridership on the remaining buses.
The 92 Loop route may need to be upgraded to be an all-day service, to provide enough capacity on University, while providing enough buses with staggered schedules on Columbia to give frequent service to support untimed transfers to the 7 at King & Columbia.
(more…)

Read More »

LRT fundamentals never stronger

Some pretty amazing numbers are shedding light on the future of light rail in Waterloo region.

This week, regional staff showed how eagerly Grand River Transit’s service improvements have been embraced (link is PDF). With 22 million trips served in 2013, transit use has doubled in just 10 years, and GRT is knocking over ridership targets years early. In Ontario, only two systems (Brampton and York) grew faster, each against a backdrop of exploding population. Waterloo region has grown in size too, but is unique for how strongly transit use has grown per capita.

(more…)

Read More »