Comments on Rapid Transit Options

All the consultation centres for Rapid Transit implementation options have taken place, but you still have until tomorrow (Friday the 25th) to make your opinions count! The official Rapid Transit site has the information which was presented at the centres and you can find the comment form here.

We fully support a Light Rail Transit based approach. That said, there are two main issues of concern to us at this stage, and we encourage you to add your thoughts on them to your comments or to otherwise contact Rapid Transit staff to convey your own concerns. The issues are detailed below.

The first one is the routing of proposed Light Rail Transit through Uptown Waterloo. The plan has the two directions split, the southbound track going along Caroline and Allen and the northbound along King and Erb. We believe locating the stops on separate streets is problematic and a missed opportunity for a better, more consolidated design. Staff tell us that there are difficulties with right-of-way size, underground utilities, parking, and the BIA that have resulted in the current planned alignment. We believe a better option would run both directions up King Street and then turn near the current freight tracks, and that this could initially be done using a single track on a small piece of the corridor. This would allow a consolidated station right at the public square. Another option is to run both directions on Caroline Street, again using a single track to deal with narrow right-of-way (namely, at William Street).

Our other main issue is with the mid-block location of several stations in Waterloo: one is to be at Seagram Drive, one at UW Davis Center, and one at the R&T Park. We’ve been told that Wilfrid Laurier University insists on a Seagram stop, and that Grand River Transit and GO Transit are intending for a major terminal off Phillip Street, next to a UW Davis Centre stop. We believe these choices contradict the aims of creating a grid-based network which is understandable by users. A mid-block terminal between Columbia and University would either force buses on those streets to go out of their way or would force a poor connection between cross-corridor routes and the LRT line. We also do not believe Seagram Drive has anywhere near the potential of developing as a corridor that University Avenue does. In the not-too-distant future University Avenue is likely to be a candidate for Rapid Transit itself, so it’s important that we are planning for future connections.

Our preferred alternative would be to eliminate the Seagram Drive station, and to instead have stations at University Avenue, at Columbia Street, and at Bearinger Road. If a Seagram Drive station must be included, it would best be added to the above three, instead of forcing the other stations to mid-block locations. Finally, if stations cannot be changed, we propose that instead of the terminal being off Phillip Street, that a busway be constructed between University Avenue and Columbia Street to facilitate access to the terminal.

Finally, we would like to see consolidation of stations at Charles & Borden, an extra station at Mill & Ottawa, and curbside painted bus lanes on Hespeler Road for the iXpress / aBRT – to be implemented as soon as possible.

Read More »

Major Transit Increases Begin

This year will be the first year of a new program of major transit improvements in Waterloo Region.

Last night Regional Council passed its 2011 budget, with a 0.75% increase for Police Services and a 0.72% increase for everything else. Thanks to some uploading to the province, the service improvements this year still leave the overall increase (1.43%) well below the 2.2% or so current level of inflation.

The most notable aspect of this year’s budget is its inclusion of an increase to fund the first year of the 20-year Regional Transportation Master Plan (RTMP), which calls for a major shift in focus to transit. The plan calls for an increase of 1.15-1.2% to fund transit over the first five years, and then ramping up to 1.3-1.5% in the subsequent fifteen years. This year staff had asked for 1.25% in order to avoid that ramp-up later, which would have seeded the newly-created RTMP Reserve Fund with $4.05 million. (more…)

Read More »

TriTAG Asks Regional Council for Overnight iXpress in 2011

(Below is the statement I made at yesterday’s Regional budget input meeting. Please call and write your regional councillors expressing your support for these initiatives. Their contact information is at the following link: http://bit.ly/hvkN5t)

Hi, I’m Tim Mollison, I live in Kitchener, and I’m here to represent the The Tri-Cities Transport Action Group, or TriTAG. TriTAG was founded in May 2009 with the idea that people should be able to walk, cycle, and take transit to everywhere they need to go, with dignity. These modes should be accessible to as many people as possible, and made as useful as possible, because transit and active transportation are better for the environment, public health, and the form of our cities.

I’m here this evening to speak about the Regional Transportation Master Plan. (more…)

Read More »

Public Consultations on Ten Rapid Transit Options

Between March 1 and March 10, Waterloo Region will host public consultation centres on options for Rapid Transit. Residents will have the option to consult directly with the Rapid Transit team, and share in the decision about which of the ten revised rapid transit options now on the table should be given further consideration by Regional Council.

In 2009, Council had approved in principle a rapid transit option combining light rail through the Kitchener-Waterloo urban corridor, with bus rapid transit connecting to Cambridge. Provincial and Federal funding fell short of projected costs, and so the Region has developed a comparison of ten options, ranging from LRT through the entire corridor to an “as is” comparison in which we do not implement any light rail. The remaining eight options contain a combination of LRT and BRT or aBRT (adapted Bus Rapid Transit). You can read a summary of these options in the Record or download the staff report.

The consultations provide the best forum for interested citizens to ask questions and bring up concerns about any of the current options or about the rapid transit plan in general. Each meeting will be attended by regional staff who are directly involved in the project and who will be prepared to answer questions. Public input from these consultations will inform staff’s decision on which one or two options to bring back to council for further deliberations. In short, attending these meetings and voicing your opinions is the single best way to influence the course of rapid transit in Waterloo Region. It is also the best resource for becoming informed about what is actually being proposed.

The meetings will be held at locations in St. Jacobs, Waterloo, Kitchener, and Cambridge:

St. Jacobs:

Tuesday, March 1, Calvary United Church, 48 Hawkesville Rd. 3-8 p.m. (Facebook event.)

Waterloo:

Thursday, March 3, Albert McCormick Community Centre, 500 Parkside Dr., 3-8 p.m. (Facebook event.)
Wednesday, March 9, First United Church, 16 William St. W., 3-8 p.m. (Facebook event.)

Kitchener

Thursday, March 3, Region of Waterloo Headquarters, Front Lobby, 150 Frederick St., 3-8 p.m. (Facebook event.)
Thursday, March 10, Faith Lutheran Church, 247 Westmount Rd. E., 3-8 p.m. (Facebook event.)

Cambridge

Wednesday, March 9, Region of Waterloo Cambridge Office, 150 Main St., 3-8 p.m. (Facebook event.)
Thursday, March 10, United Kingdom Club, 35 International Village Dr., 3-8 p.m. (Facebook event.)

Read More »

TriTAG statement to Regional Council, 19 January 2011

Chair Seiling, Members of Council,

Light Rail Transit was never chosen because it had a lower capital cost than a bus-based solution. The project was chosen because it requires fewer wages to operate than buses, and because the rails it runs on attract private-sector investment. Why would Council, which voted in favour of this project on its merits alone in 2009, vote to reconsider? Has Council not done its due diligence? Or, was the value of the project, and its sister project, the Regional Transportation Master Plan, not properly explained to citizens?

(more…)

Read More »

Toronto doesn’t want LRT? We’ll take it!

The Honourable Kathleen Wynne, Minister of Transportation
77 Wellesley St. W.
Toronto, ON M7A 1Z8

Re: Possible Toronto LRT project cancellations

Minister Wynne,

While it is with concern that I read of possible LRT project cancellations in Toronto with the inauguration of Mayor Rob Ford, I would like to take the opportunity to identify a very deserving recipient of the Province of Ontario’s infrastructure funding should Transit City indeed be cancelled.

As your government has already graciously funded Phase 1 of the Region of Waterloo’s Rapid Transit project, as well as the expansion of GO Transit rail service to Kitchener, I humbly submit to you that Phase 2 of the Region of Waterloo’s Light Rail Transit project, as well as GO expansion to the city of Cambridge, should be the first recipient of any moneys rejected by Mayor Ford.

(more…)

Read More »

Rally for Rails Roundup

Resounding success at Rally for Rails! At least 200 of you braved the freezing cold for an hour to support the Region of Waterloo’s LRT project. The Rally was covered on CTV, and in The Record.

Remember, the train doesn’t stop here – your friends, neighbours, relatives and local businesses need to know the truth about LRT, and we need your help. If you have run out of double-sided information pamphlets, you can download more for printing at the (PDF) links below:

LRT Info Pamphlet – Greyscale

LRT Info Pamphlet – Colour

Finally, thank you all for coming out today. Each and every one of you who attended helped make this a resounding success!

Read More »

Rally for Rails Resources

On December 5th TriTAG will be hosting the Rally for Rails in partnership with Wonderful Waterloo and Waterloo Students Planning Advisory. It runs from 12pm to 1pm in Waterloo Public Square, at the corner of King St S and Willis Way. You can take a look at the Rally for Rails event on Facebook.

For those of you that want to help us advertise the rally we have created “ticket” leaflets that you can distribute and posters than you can put up. All of these are PDFs which should be printed with Page Scaling set to None on the Print Options dialog. The posters will look best if trimmed to size, as they are shorter than standard letter paper.

  Colour Version Greyscale Version
Rally Tickets
These print 4 to a page. Cut them up and distribute them to friends and family, or set them out at work, school, or anywhere else people will see them.
Download Rally Tickets (colour) Download Rally Tickets (greyscale)
Rally Posters
These print 1 per page. Trim them after printing for best results. Put them up at work, school, or anywhere else people will see them.
Download Rally Poster (colour) Download Rally Poster (greyscale)

Read More »

Candidates Unsure About LRT But Support Transportation Change

Our website features the responses to our transportation survey of nearly 90 candidates for City Councils and Regional Council in the Region of Waterloo (including Mayors). The election will be next Monday, October 25. We asked candidates for their stances on dealing with growth-related traffic, light rail transit, sidewalks, segregated bicycle infrastructure, parking, and mixed-use zoning. In a “why we’re asking” section, we explained TriTAG’s stance and provided links for further information.

A number of themes were shared in many responses, including views on parking and cycling. There is near consensus that it is inappropriate for municipal staff to be provided with transportation subsidies exclusively in the form of parking. There was support for a bike-sharing system like Montreal’s BIXI, and there was widespread enthusiasm for segregated cycling infrastructure. To make cycling feel safer and be a more viable transportation choice, we believe on-street bicycle infrastructure must be physically separated from motor vehicle traffic and prioritized at intersections.

Candidates expressed support for mixed-use zoning along arterial roads, and many candidates agreed that minimum parking requirements in municipal zoning should be reduced or eliminated.

Regional Council candidates expressed a wide range of views on the light rail transit (LRT) project, with some suggesting it should be scrapped, others suggesting that they prefer bus rapid transit (BRT), and many indicating that they would support it if modifications take into account the funding situation. Overwhelmingly, candidates believe that transit should be improved to be a choice for everyone and not only a social service, and that transit should be a primary means of dealing with continued growth.

The responses are posted at our 2010 election page. Candidates who have not responded may still contact us to do so.

Read More »

LRT Investment is the Right Choice

(Photo: William Murphy / Flickr)

As most people have heard, two weeks ago Prime Minister Harper announced Federal funding for Waterloo Region’s Rapid Transit project. The amount is 1/3 of project costs, up to $265 million, for the first phase of light rail (LRT) and express bus line. But the conversation in local media and by many municipal candidates has shifted to the so-called shortfall. That, horror of horrors, the lower-tier municipality would have to contribute a portion (around $235 million, or less than 1/3) of the capital costs of a long-term transit and growth management project. This post addresses several common themes in objections to funding light rail.

From seeing some discussion of the LRT, you would think this is something that would be built for today’s needs. Infrastructure, however, can’t be built overnight, and can’t influence much until it is built. But while the project would be a well-used part of a transit system on opening day, the larger purpose is to manage future growth of the Region. The area continues to grow rapidly, and is to add 200,000 to its existing half-million population. LRT is about building the transportation infrastructure that will attract development to the urban core areas and that will be able to handle the resulting travel demand. Failing to do this would result in major development occurring on greenfield sites and pressure to push out the urban boundary to accommodate more sprawl. The costs of the road widening and other infrastructure needed to support that sprawl are far higher than the costs of the LRT system. Avoiding building any new transportation infrastructure will result in serious traffic congestion and lost economic productivity in the Region. (more…)

Read More »