Category Archives: Transit

uw

Upcoming consultations: Columbia/Lexington, ION stops, and more

There are a handful of public meetings and input sessions coming up this month, for both Waterloo and Kitchener, as well as for rapid transit.

Columbia/Lexington

Columbia/Lexington from King to DavenportLexington can be the most comfortable place to cross the Conestoga Parkway in Waterloo due to the lack of on/off ramps, but with four lanes and high traffic speeds, that’s not saying much. Fortunately, it looks as though the City is preparing to propose new cycling infrastructure on that corridor between King Street and Davenport.

UPDATE: A public drop-in consultation will be held next Wednesday June 3 from 6-8pm in Waterloo Mennonite Brethren Church. (Note: earlier, this meeting had been scheduled for May 13, but has since been moved.)

ION stop anchor wall designs

Willis Way stop anchor wallThe Rapid Transit team has just unveiled designs for the anchor walls of ION stops – a 5 x 5 metre feature that will give each station a unique visual identity. (We’ve written before on the importance of stop design for wayfinding.) Two drop-in consultations are being held to gather public feedback on the designs: the first at Knox Church in Waterloo on May 20 from 3-8pm, and the second at Regional Headquarters in Kitchener on May 21 from 3-8pm.  Comments can also be submitted online.

Kitchener Planning Around Rapid Transit Stations (PARTS)

Map of Kitchener Central Stations Study AreaKitchener is developing plans to help guide growth around ION stop areas. On Tuesday May 26, they will be hosting a public information centre concerning the Central Station Areas Study.  The meeting will be held from 6:30-8:30pm, in the Conestoga Room at City Hall, with a formal presentation at 6:45.

Uptown Streetscape

#bikeuptownWe’ve learned that the proposal for protected bike lanes on King Street in Uptown from Erb all the way to University is going to Waterloo City Council on May 25. Visit tritag.ca/bikeuptown to learn more, contact councillors, and spread the word about this important project.

Iron Horse Trail improvement strategy

The City of Kitchener is looking to make improvements along the Iron Horse Trail, and is hosting a series of input opportunities and meetings in late May and early June. These include a number of on-trail input stations, a workshop, and a public meeting. More details can be found on the City of Kitchener website.

Read More »

Photo by Sean Marshall on Flickr, licensed under CC-BY-NC

What about the bus?

The announcement for electrified Regional Express Rail on the GO network and the provincial budget have raised concerns in Waterloo Region as to when we will be getting two-way, all-day GO train service. (Kitchener-Centre MPP Daiene Vernile confirmed that the CN freight corridor through Brampton is a barrier, but that acquisition of that corridor was an option the province is considering.) Lost in the details however, is another area of GO service that is likely to improve much more quickly.

We’re talking about GO buses. (more…)

Read More »

North mainline track condition (a)

What does the GO service expansion mean for Waterloo Region?

On Friday, the province announced its ten year plan for implementing “Regional Express Rail” (RER) throughout the GTHA. Previously cast during the provincial elections as electrification and  15 minute service frequency on all corridors, this plan narrows the scope of this expansion to certain lines and more central areas. Nevertheless, if implemented, RER would represent a quadrupling of the number of weekly train trips in the network, and an expenditure of $13.5 billion. It’s both ambitious  and, for those commuting to or from Waterloo Region, disappointing.

The announced schedule for increased service over ten years only pledges 30 minute “peak period, peak direction” service from Kitchener – a far cry from all-day service in both directions for those travelling from the GTA to work in the Region. Electrification of the Kitchener line, which would enable more frequent and faster trains, is only planned to the Bramalea GO station. (There is also no mention of electrification the CP-owned Milton Line or its extension to Cambridge [1].)

Considering that Kitchener is already expecting two new trips by the end of 2016,  we will soon be close to the pledged 30-minute peak service promised, meaning we may not see many improvements in the remaining nine years. Two adjacent bottlenecks appear to be at play here: the single-tracked Guelph Subdivision from Kitchener to Georgetown, and the freight corridor in Brampton between Georgetown and Bramalea.  (more…)

Read More »

april2015transit_changes

2015 GRT preferred service improvement plan

Beginning tomorrow, Grand River Transit will be hosting a series of public consultations on its preferred 2015 service improvement plan.  These new route designs, mostly centred around Kitchener wards 1, 2, 7, 8, 9, and 10, continue the trend of a more direct, grid-like frequent service network we saw for Waterloo in 2013. We encourage you to attend a session or submit your feedback online.

Notable changes include a new Victoria/Highland iXpress route, more continuos cross-corridor (east-west-ish) routes, limited service to Bingeman’s Centre Drive, and gradual shifts away from Highland Hills and Charles Street Terminal towards The Boardwalk and the future transit hub for certain routes. Many of these changes are in preparation for ION light rail. Certain route changes have also spurred investigation of a new highway crossing for people on foot and bike.

Some of the preferred improvements, especially around the central transit corridor, are scaled back from what had originally been proposed in the fall, in part due to the challenges and resource constraints during ION construction.

We’ve tried to summarize these changes in the post below. While not part of the plan under consultation, we’ve also included changes to Cambridge service and the announcement of funding for transit in Wilmot in our discussion.

(more…)

Read More »

Transit and the 2015 budget: a letter to Regional Council

Dear members of Regional Council,

Over the past several years, transit has been squeezed to meet arbitrary cost-recovery targets. Now that GRT has achieved those targets, TriTAG is pleased to see that the proposed 2015 Regional budget does not include any more painful cuts to transit, but instead focuses on continuing to prepare for integration with ION light rail and adapted bus rapid transit service.

We hope that 2015 also marks an end to the sharp fare hikes of the last few years. As the Region develops its new Strategic and GRT Business Plans, it has the opportunity to set fare and cost-recovery policies to satisfy concrete goals for transportation, ridership, social equity, and the environment.  We encourage council to be proactive in considering these goals when deciding on fare and service changes. (more…)

Read More »

grtmap2-2

Thoughts on the GRT 2015 Improvement Plan

We’ve written briefly about Grand River Transit’s proposed 2015 Service Changes, and we’d like to share a few observations we’ve had, both about how these changes will improve the transit system in Waterloo Region, and the challenges ahead as we move towards a fast, frequent, grid network.

We encourage everyone to provide your feedback to GRT, at both at their final public consultation on Wednesday November 26th, and via their online response form.

Route 7

With a consolidated route 7 appearing in both options for the 2015 service, it seems that GRT is strongly committed to the kind of service improvement that we have talked about on numerous occasions. Splitting the East/West service off of route 7 by removing the 7D/E branches and replacing them with increased University and Columbia service is an important change that will improve the transit experience along the full length of King St without increasing costs.

New Route 7

The new consolidated route 7 will allow for frequent, direct, service every 7.5 minutes to employment and retail on King St north of Columbia, and Weber St east of the expressway. Coverage goals around Fairview Mall would be served by the 1, 8 and 23. This keeps the most frequent service on the busier corridors without having to run through quiet residential streets, but keeps local service for the neighbourhood.

With the separation of the north-south from east-west services at King & University, this will mean transfers. Currently the 7 does not connect with the 202, and it is a long walk to the existing iXpress stop. As the major east-west route, the 202 will need a stop at King & University to support these transfers.

University/Columbia Capacity

Removing the 7D/E branches will take away existing capacity on University and Columbia Avenues. GRT will need to evaluate service on these streets, to make sure there is enough capacity to handle the extra ridership on the remaining buses.
The 92 Loop route may need to be upgraded to be an all-day service, to provide enough capacity on University, while providing enough buses with staggered schedules on Columbia to give frequent service to support untimed transfers to the 7 at King & Columbia.
(more…)

Read More »

grtmap2-2

GRT 2015 Service Changes

Today, Grand River Transit began public consultations on its 2015 service changes. They include the next phase of grid-based network restructuring with a new cross-town iXpress route, as well as the rationalization of Route 7 mainline service that we have long advocated for. We will have more analysis of these changes later, but we’ll start with a brief overview and encourage you to attend the consultations.

Some of the notable Kitchener network changes include a new Highland-Victoria iXpress route, modifying Route 20 to be a continuous crosstown route on Victoria and Frederick, and one option for launching part of the Ottawa iXpress several years earlier than planned.

GRT had planned to reconsider Route 7 after the launch of ION, but they are moving this change up earlier. One of the challenges of the current design is that each of the Route 7 branches is scheduled independently, making consistent headways very challenging, especially if there are delays. With the construction of ION on King Street starting in 2015, a move to a single, headway-scheduled service would allow GRT to provide more reliable and predictable service.

We do have some ideas for what might be worth considering for the 2015 plans:

  • Adding stops at Queen/Courtland and Victoria/Frederick to the 204 iXpress
  • Better serving St. Mary’s Hospital with the 204 iXpress
  • Adding a stop of the iXpress 202 at King/University to allow transfers with the consolidated Route 7

And while the Route 7 restructuring is badly needed, GRT must be clearer about what service levels the consolidated Route 7, the upgraded iXpress 200, and University Loop will have to compensate for the removal of the branches.

That said, we are thrilled to see GRT continue to add cross-town iXpress service and to straighten out route networks.

Have your say! Attend the public consultation sessions or fill out GRT’s online comment form available on the consultation page alongside the detailed information and maps. Location and schedule are also in our public meeting calendar in the sidebar.

Read More »

all aboard

A referendum for the future

The votes are counted, the winners declared, and the dust has settled.

What to make of the election that was to be the “LRT referendum we’ve been waiting for?” If it truly was such a referendum, that score has been settled: despite an enormous budget to support of a candidate who made his name known fighting the region in the courts on LRT, despite a former MP and a former weatherman both with massive name recognition also championing the cause, no LRT opponent was able to muster the support they thought their issue deserved.

That’s not to say that the 76% of voters who didn’t vote for Jay Aissa are all pro-LRT, or that the almost 70% of residents who didn’t even come out to vote (come on, people!) are all ardent LRT supporters. Certainly not. But what the results clearly indicate is that overall, the people of Waterloo Region are satisfied with the direction we are moving in.

And why not? Over the last decade we have seen the resurgence of our community’s once-dilapidated cores, a resilient economy which (while not universally strong) has not only survived but thrived in the face of the decline of a headliner employer, and the emergence of this region as the most progressive small city in Ontario for tackling the challenges of growth, sprawl, and sustainability.

On the basis of our success so far, a majority of people are willing to accept that we must continue to plan for the future, and that we need continue to innovate. Many still reserve judgement on the most visible aspect of this plan (LRT), but they’re not interested in opposing it. Turning back now flies in the face of our community tradition of barn-raising and reinvention. Our no-nonsense progressiveness brooks no nonsense. This is the real reason the cancel-LRT crusade failed.

For those of us who have supported and advocated for LRT over the years, today is a very good day: it marks the end of activity to halt ION which will roll out in 2017. But it is not the end to the challenges our region will face as it grows up. Certainly, last night’s results do not guarantee the success of ION light rail transit.

Only you can do that.

Over the next three years, a very complex project will need to come in on time, and on budget… and it will then need to meet or exceed expectations. The early signs are good, but we have no certainty that it will continue. We have newly elected leaders who have committed to careful stewardship of what the previous council initiated, but that’s not enough. We all need to stay engaged and hold our regional government’s feet to the fire. We need to be the voice of conscience and of reason. We have to keep the pressure on council to make good decisions not just about LRT, but on transit as a whole, and the other complex issues that tie into it: growth management, affordable housing, and debt.

In June 2011, on the eve of the council vote on LRT, I wrote:

After last Saturday’s rally, Jean Haalboom, one of the few supporting councillors willing to stand up for rapid transit and LRT, said to a few of us that we can’t just drop this issue on Thursday if this vote passes. We have to keep on it. 2014’s municipal vote could become a last-gasp money-burning cancellation movement if we go silent again after the immediate fight is won.

Most of us support LRT because we’re thinking about the future, right? Well, it’s time we take the long view. LRT doesn’t get delivered if and when Council votes yes. In the years to come, we need to shepherd it home.

It’s amazing how close that possible future actually came to becoming reality. The immediate fight was won, and then had to be won again, and again. Now we can say with some finality that “yes, LRT will be delivered.” Now we can focus on making sure that what is delivered lives up to the vision.

After all, we’re not done yet: Cambridge has been left out in the cold, and one of the most meaningful gestures we can make to heal the rift and connect our three cities is to extend ION in Phase 2 without hesitation. Connecting Cambridge might take several years, but it needs to happen so we can start to think of ourselves not as three separate cities, but one region.

We live in  the 10th largest urban area in Canada, but our own community self-image is still catching up to this reality. Over half a million people call Waterloo Region home, and we can expect another 200,000 in a couple of decades. Our region has some serious challenges to face in the coming years.

This election may have been a referendum after all. Will we confront the challenges that come with growth? Will we continue to plan and innovate to create a more livable, sustainable place to call home? Are we ready to invest in our future?

The result appears to be a resounding Yes.

Read More »